4.Trailer (Numerical) |
Click "Coach/Wagon" button.
Input required data in the same way as "Whole Train".
Click "Numeric Mode" button and then newly displayed "Input Performance Data" button.
Input fields for a trailer are shown below. In this case, "Speed" and
"Resistance" are required.
Resistance(O) is the running resistance at the open sky section.
Resistance(T) is the running resistance at the tunnel section.
Input required data in the same way described before.
©2021 JETconnect Co,. LTD All rights reserved.